Later in the Schedule
Railings are often installed late in the schedule. On balcony projects, that is when coordination failures typically show up.
Integrated System
Cemplex Group installs integrated railing systems engineered to work with waterproofed concrete balconies and drip-through decks without compromising the critical connection detail.
Balcony projects move through multiple trades before railings are set. We plan installation around those transitions.
Our crews coordinate with:
The result is a railing installation that fits the construction sequence instead of colliding with it.


This is not just a railing install. The system incorporates an integrated connection detail designed to eliminate one of the most common causes of balcony leaks: post penetrations through the waterproofing layer.
Key advantages include:
When the attachment detail is handled correctly, liability risk drops significantly.
Rail posts attach at the finished walking surface with structural anchorage below, suited for open deck drainage assemblies.
Attachment planning is addressed before the topping pour so the railing installation follows the correct sequence and protects the waterproofing layer.
Balcony details can create delays when scopes overlap.
We focus on: